Schedule of Fees
(A) Certificate of Occupancy NO FEE
(B) Building and Zoning Permit
- Residential – per sq. ft. $ .10
- Commercial – per sq. ft. $ .12
- Minimum fee $25.00
(C) Sign Permit $15.00
(D) Application to Zoning Board of Appeals
- Conditional Use Approval
- Residential Uses $ 100.00
- Non-Residential Uses $ 200.00
- Variance of Zoning Law
- Residential Uses $ 50.00
- Non-Residential Uses $200.00
- Interpretation of the Zoning Law or Map $. 50.00
- Appeal from a Decision of the Zoning Enforcement Officer
- Residential Uses $100.00
- Non-Residential Uses $200.00
- Application to the Planning Board
- Sketch Plan Review $ 50.00
- Consideration of Plan After Sketch Plan Review
- Minor Sub-division 1 – 4 Lots $25.00 per lot
- Major Sub-division 5 & more$50.00 per lot
- Petitions to the Town Board to Amend the Zoning Law and/or Zoning Map NO FEE
- Oil and Gas Storage Tanks – All types, above & below ground
- 276 to 1,000 Gallons $50.00 per tank
- 1,001 to 2,000 Gallons $50.00 per tank
- 2,001 to 30,000 Gallons $50.00 per tank
- 30,001 Gallon and Over $50.00 per tank
- Demolition Work (AIl Inclusive)
- Residential $25.00
- Non-Residential $50.00
- Wood Stove/Pellet Stove Permit – $ 25.00
Wood Stove/Pellet Stove Inspection:- Prior to Use $25.00
- Post Fire Inspection NO FEE
- Inspection on Demand $35.00
- Swimming Pool Permits
- In-ground/Above ground- 20′-24′: $ 25.00
- 25′-27′ or larger: $ 35.00
- Solar Panel Permit
- Tier 1 Solar System-$50.00
- Tier 2 Solar System-$100.00
- Tier 3 Solar System-$.12 per square foot
- Telecommunication-Modification to Tower-$250.00
(E) Construction Without Permit
Construction without required building permits will result in a non-negotiable penalty fee as follows:
1. If the construction is less than 200 square feet the penalty is $ 25.00
2. If the construction is at least 200 square feet by less than 900 square feet, the penalty is $250.00
3. If the construction is 900 square feet or larger the penalty is $500.00
